Commit Graph

9 Commits

Author SHA1 Message Date
dave
74ea0b7050 Only consider complete/paymentpending for tour scheduling. 2010-03-29 07:50:49 +00:00
dave
d2868f3f45 - Updates to the tour annealer:
- Add more verbose output for the terminal
	- Split the student load / tour preference load to capture student who
	  didn't select any tours
	- Allow students with no tour selection to be placed anywhere with no
	  penalty
	- Add a missing break; in cost computation (doesn't change the result)
2008-04-02 06:25:50 +00:00
dave
6a766ac59d - fix copy/paste error in the tour annealer 2008-02-12 01:11:21 +00:00
dave
b47ac24ed1 - Decrease the cost of students not from the same school +5 could lead to a
large penalty (5*20=100) which exceeds the cost of a 1st vs. 2nd choice tour.
  This could cause a student to be bumped to a 2nd choice tour for no reason
  other than to fix the schools.  The idea for duplicate schools is to only
  prefer to have 2 students from the same school on a tour if there's
  a choice that oculd go either way, this will break that tie.
2007-12-23 19:15:50 +00:00
dave
c8d01cb8fb - Handle the case where a student doesn't use all their tour rankings. 2007-12-20 04:29:16 +00:00
dave
998fe35d67 - Add a tour number to the database, and modify the tour editor to include the
number, and an option to create numbers automatically
- Completely remove all references (hopefully) to the Tour ID
- Add a Tour type report
- Rework the student report query so it actually makes sense.  It really should
  be a whole bunch of left joins based on the students.  Using comma (cross)
  joins creates situations where if the right side of the join doesn't have
  information, it wipes out the left side.  (Happened before with emergency
  contact info).
- Remove the (two) old custom tour reports
- Add 4 new tour reports to the database:
	- ALL tours for the committee, tour list for students, 
	student emergency contact info for tour coordinators, and 
	a list of tour assignments for students
2007-12-20 01:05:04 +00:00
dave
b0338f9fdf - Add 3 config variables: An effort for the tour annealer, and the updater
activity and percent.
- Add the status update and links to automatically start the "tour assigner".
  (Didn't want to call it a scheduler, because someone might thing it's for
  assigning tours to timeslots or something)
2007-12-19 21:12:57 +00:00
dave
5ad72acabf - Finish the cost function explanation 2007-12-19 19:58:15 +00:00
dave
c5887eb432 - A working tour annealer.. Now I just have to glue it all together. 2007-12-19 19:52:11 +00:00